Home > Company news

Contact

  • Room 11608, Unit 1, Building C, Door of Metropolis, Tangyan South Road, New Area of High-tech District, Xi'an City, Shaanxi Province, China

  • +86-29-89305761

  • +86-29-89305769

  • brightway@brightwaysolids.com

Cases

Company news

CBM Drilling Rig Mud System Delivered to Customers

2021-11-01

On the evening of October 30, a drilling rig mud system for a coal-bed methane drilling rig was being loaded and shipped to a coal-bed methane drilling project site in China. 

There are some sites in China dedicated to coal-bed methane drilling and production. They have abundant coal-bed methane reserve and a high degree of development in coal-bed methane excavation. Corresponding to the relatively large demand for drilling and production equipment related to coal-bed methane drilling, Brightway, as a drilling solids control system design and production company, is providing state-of-the-art equipment to customers all over the world all year round, especially mud solids control system for oil drilling and coalbed methane drilling projects. 

There are two sets of CBM drilling solids control system production projects. This is the first set shipped. The system is equipped with shale shaker, mud cleaner, decanter centrifuge, mixing equipment, elevated oil tank, etc. From production to delivery, all production processes have been strictly controlled. Customers also visited the factory many times and gave positive comments on the production of the energy equipment. Currently, the second set of projects is under intense production, and it is expected that the delivery deadline will be met within this month. 

As a manufacturer of drilling solids control systems, Brightway is committed to the development and production of drilling solids control systems for oilfield drilling and coalbed methane drilling. Currently, it can produce drilling solids control systems of different specifications, oil tanks and other equipment. 

For more information, visit https://www.brightwaysolids.com/CBM-drilling-Mud-System_p47.html

Previous :HDD Drilling Mud Recovery System Helps Underground Optical Cable Laying Projects

Next :Leaders of Xianyang Visited Brightway for Inspection and Observation

Feedback Form

* Your Name:
* Email:
* Company:
* Fax:
* Phone Number:
* Message: