Home > Oil Drilling Waste Management System

Contact

  • Room 11608, Unit 1, Building C, Door of Metropolis, Tangyan South Road, New Area of High-tech District, Xi'an City, Shaanxi Province, China

  • +86-29-89305761

  • +86-29-89305769

  • brightway@brightwaysolids.com

Cases

Oil Drilling Waste Management System

  • Oily Sludge Treatment System for Domestic Oilfield 2017-05-19

    This system is designed and manufactured based on site conditions and repeated experiments of oily sludge treatment. It is composed of Drying Shaker, Vertical Cuttings Dryer,Three-phase Separator, Water Filter Device, Water treatment plant, Electrical Control ...

  • Oil Drilling Waste Management Matching With Drilling Mud System 2017-05-18

      Oil Drilling Waste Management Matching With Drilling Mud System The Oil Drilling Waste Management is Matching With ZJ40 Drilling Mud System. The Capacity is up to 50T/h. It is composed of Cuttings Dryer and Decanter Centrifuge. That is the core Equipmen...

  • Drilling Cuttings Dryer on Inner Mongolia Site 2017-05-18

     Drilling Cuttings Dryer on Inner Mongolia  Site  The Drilling Cuttings Dryer will be match with screw conveyer and other drilling mud system in oilfield and achieve  drill cuttings drying. The cuttings dryer capacity can be up to 40t/h. Ap...

Feedback Form

* Your Name:
* Email:
* Company:
* Fax:
* Phone Number:
* Message: